libertyville, Illinois
Date
2022
Facility/Site
Aspen Drive location had 5,200 sf New Construction and the Libertyville Cook Park location was 954 sf of exterior wall Reconstruction.
New Construction of Exterior Modifications at two locations. Aspen Dr. installed a new entrance plaza and Cook Park had extensive steel curtainwall replacement activity.
libertyville, Illinois
David Archer
Library Director
(224) 513-7402
Aspen Drive – New Entrance including plaza hardscape, landscaping along the west façade, an EV charging port and new lighting bollards.
Libertyville Cook Park – Replacement of existing steel framed curtainwall & clerestory windows in several locations, as well as the addition of several poke-thru electrical devices.
Category: New Construction
Budget: $835,000