Wauconda Area Library

PUBLIC LIBRARY

Wauconda Area Library

Wauconda, Illinois

Project Scope

Wauconda Area Library enlisted Featherstone to steward forward the total reconfiguration that the library underwent in the last decade. A transformative project in 2015 consisted of an awardwinning expansion of 17,000 sf to the existing 14,000 sf library. This entailed adding a second story to the existing structure and expanding the building in all four directions. In 2018, a complete interior and exterior renovation was completed which included significant site improvements and a new front entryway.   

Location

Wauconda Area Library
801 North Main Street
Wauconda, IL 60084

Reference

Thomas Kern
Director
847.526.6225 x209

Awards

1998 Distinguished Building Award
2005 Library of the Year Award

The Featherstone Difference

Special consideration was provided in evaluating the complete renovation and expansion of the original undersized library since funds were limited and the community still demanded access to the library during it much needed renovation and expansion project.  Through Tom Featherstone’s leadership and determination of getting the most economically delivery while maintaining the valuable resource to the community, vacate store space in downtown Wauconda was study as a potential temporary branch location with easy public access.  After preparing all the cost and scheduling information, the plan became very apparent to move the library out of the current location to the temporary vacant store, which was also renovated as part of the overall project budget, to maintain the visitor’s experience while saving the library multiple phases of renovation, shorter overall construction durations, and allowing more of the capital improvement funds to be allocated towards valuable library improvements.  Through the success of the original project, Featherstone has been brough back year after year to care for the upkeep, maintenance, and two additional renovation projects including the most resent new entrance project all spanning over 27 years.

Category: Total Building Renovation

Budget: $4,000,000

Because of Featherstone’s proven standard of excellence in construction management and customer relations, we have hired them for other projects in recent years.

– Thomas Kern
Waiconda Area Library

Wauconda Featherstone

Featherstone Facts

Average Bid to Build Variance -3.11%,
Average Value for Fee at 145%
Last 5 years – 5 Fabulous Parks
Last 5 years – 5 Fantastic Libraries
Multiple, Decades-Longstanding, Client Relationships – The Morton Arboretum, Chicago Botanic Garden, Brookfield Zoo, the Wauconda Public Library, The Schaumburg Township District Library